Home / News / Wells Road Pumping Station Force Main Repairs

On March 3, 2020, a walker called in an apparent break in the pressure force main on the Bridle Path.  The break occurred approximately 800 feet from the entrance to the Bridle Path on Western Avenue.  Crews were able to shut down the station and contain the leak while repairs were made.

Fortunately, a rapid mobilization of crews from A-1 Septic and Brex Construction allowed the repairs to be made by 5:30 the same day.  Staff at KSD were very appreciative of the timely manner that these crews were able to respond and address the break.  The total cost for the repairs was just under $13,000.